47 minutes ago, PREPOSTEROUS said:

spacer.png

 

spacer.png

 

More from the imaginary, never going to happen Belle Vue redevelopment. East Stand almost fully demolished. Hopefully the club or the contractor will release photos as the steel starts to get erected over the off-season for people who are genuinely interested rather than those who just want to take the ######.

Agreed, you Wakey fans have copped plenty regarding the stadium  now your doing something about it your still copping it. 

Ill be keeping an eye on thus  i love a good stadium referb. 

Wil the new stand have dug outs in it? 

 

  • Like 1
Link to comment
Share on other sites


16 minutes ago, Ragingbull said:

Agreed, you Wakey fans have copped plenty regarding the stadium  now your doing something about it your still copping it. 

Ill be keeping an eye on thus  i love a good stadium referb. 

Wil the new stand have dug outs in it? 

 

Yes, complete with recycled canteen chairs. 😉

Edited by PREPOSTEROUS
  • Haha 2
Link to comment
Share on other sites

54 minutes ago, Ragingbull said:

Agreed, you Wakey fans have copped plenty regarding the stadium  now your doing something about it your still copping it. 

Ill be keeping an eye on thus  i love a good stadium referb. 

Wil the new stand have dug outs in it? 

 

Yes, I'm going to post the images on here at some point, its very impressive.

Link to comment
Share on other sites

1 hour ago, Ragingbull said:

Agreed, you Wakey fans have copped plenty regarding the stadium  now your doing something about it your still copping it. 

Ill be keeping an eye on thus  i love a good stadium referb. 

Wil the new stand have dug outs in it? 

 

As promised, the players and staff are seated in the two green area, like you get at most modern stadiums. Not dug outs as such but proper areas for both teams. Should shut Saints up.

 

 

ground.jpg

GROUND 2.jpg

Edited by Kirmonds pouch
  • Haha 2
Link to comment
Share on other sites

After going on Sunday reports are footings going in very soon so the steel should be up pretty quickly. Next thing will be the North Stand upgrade, hopefully that kicks in after the HKR game. The third piece then is the pitch will be re-laid after the season ends for a hybrid pitch. The place will be a different world next year.

  • Like 3
Link to comment
Share on other sites

2 hours ago, ShropshireBull said:

Wakey are staying up and are going to get at least half a season to tale advantage of the re dev. Congrats to them 

 

Honestly the plans are impressive. The stand is to a high spec which will have excellent facilities on and off match day.

Trinity don’t forget have put in 1 million + of their own cash and bought the ground too for a few million.

New floodlights 

New hybrid pitch

New large scoreboard

New 2 floor gym in southeast corner (refurb and restructure). Also new roof on this building. Including a cafe facility and changing rooms/classrooms etc.

Newly resurfaced car park outside new east stand with fan zone area.

this is in addition to the new east stand and resurfaced/refurbished North stand.

I can’t wait  for it to be complete and it should pave the way for further developments! Money makes money. 
 

Trinity have gone from a few years ago having nothing but playing assets to owning their land, stadium and redeveloping it. That’s a huge achievement to the Carter era. 

 

  • Like 7
Link to comment
Share on other sites

40 minutes ago, Trojan Horse said:

Honestly the plans are impressive. The stand is to a high spec which will have excellent facilities on and off match day.

Trinity don’t forget have put in 1 million + of their own cash and bought the ground too for a few million.

New floodlights 

New hybrid pitch

New large scoreboard

New 2 floor gym in southeast corner (refurb and restructure). Also new roof on this building. Including a cafe facility and changing rooms/classrooms etc.

Newly resurfaced car park outside new east stand with fan zone area.

this is in addition to the new east stand and resurfaced/refurbished North stand.

I can’t wait  for it to be complete and it should pave the way for further developments! Money makes money. 
 

Trinity have gone from a few years ago having nothing but playing assets to owning their land, stadium and redeveloping it. That’s a huge achievement to the Carter era. 

 

What are the time scales? 

Cant imagine all being completed by early Feb for the start of the season.  Is it expected Wakey will play a big chunk of thier opening games away from home?

Link to comment
Share on other sites

44 minutes ago, Trojan Horse said:

Honestly the plans are impressive. The stand is to a high spec which will have excellent facilities on and off match day.

Trinity don’t forget have put in 1 million + of their own cash and bought the ground too for a few million.

New floodlights 

New hybrid pitch

New large scoreboard

New 2 floor gym in southeast corner (refurb and restructure). Also new roof on this building. Including a cafe facility and changing rooms/classrooms etc.

Newly resurfaced car park outside new east stand with fan zone area.

this is in addition to the new east stand and resurfaced/refurbished North stand.

I can’t wait  for it to be complete and it should pave the way for further developments! Money makes money. 
 

Trinity have gone from a few years ago having nothing but playing assets to owning their land, stadium and redeveloping it. That’s a huge achievement to the Carter era. 

Sounds great. I hope this development really transforms the club and provides a big boost in attendances and income streams.

  • Like 1
Link to comment
Share on other sites

34 minutes ago, Ragingbull said:

What are the time scales? 

Cant imagine all being completed by early Feb for the start of the season.  Is it expected Wakey will play a big chunk of thier opening games away from home?

Clubs playing ‘chunks’ of games away from home,I thought Superleague didn’t allow that.

Link to comment
Share on other sites

1 hour ago, PREPOSTEROUS said:

Completion mid July 2023. We don't exactly get large crowds so can accommodate the reduced capacity, plus the work on the North Stand should bring that up to what it should be rather than the restricted capacity it's currently running at.

Yes thats the target date for completion, however I have heard once complete it will have to undergo a number of HS tests and assesments in order to get a safety certificate, so expected to be around Novemberish before it can be used.

Link to comment
Share on other sites

5 minutes ago, Agbrigg said:

Yes thats the target date for completion, however I have heard once complete it will have to undergo a number of HS tests and assesments in order to get a safety certificate, so expected to be around Novemberish before it can be used.

We may be able to stage the completion certificate much like Leeds did with the south stand. 

Link to comment
Share on other sites

9 minutes ago, Agbrigg said:

Yes thats the target date for completion, however I have heard once complete it will have to undergo a number of HS tests and assesments in order to get a safety certificate, so expected to be around Novemberish before it can be used.

Surely reserve and academy games will be used as test events to get certs? I can imagine a fair few would turn out for an evening in the summer watching rugby and getting a good look at a new stand. 

Link to comment
Share on other sites

2 hours ago, Ragingbull said:

What are the time scales? 

Cant imagine all being completed by early Feb for the start of the season.  Is it expected Wakey will play a big chunk of thier opening games away from home?

I believe the below to be roughly right.

EAST STAND: July 2023 so towards end of next season. 
 

NORTH STAND: Believe the resurfacing, barriers works etc to be done before the start of 2023 season increasing the capacity to maximum in the stand. This will be a boost as Trinity have been limited by HS issues and presently a reduced 1500 capacity. 
 

HYBRID PITCH: ready for start of 2023 season. Irrigation system included.

NEW MODERN LED FLOODLIGHTS: Already up and paid for by Wakefield trinity. They are a vast improvement!

NEW ROOF ON SOUTHEAST CORNER: Already paid for by Wakefield trinity. 
 

NEW INTERNAL REFURB OF 2 FLOOR GYM, CLASS AND CAFE: Unsure on this???

 

NEW SCOREBOARD: Unsure of when this will be installed but believe it’s a good upgrade and I think to go southeast corner.

 

 

 

  • Like 3
Link to comment
Share on other sites

11 minutes ago, Trojan Horse said:

I believe the below to be roughly right.

EAST STAND: July 2023 so towards end of next season. 
 

NORTH STAND: Believe the resurfacing, barriers works etc to be done before the start of 2023 season increasing the capacity to maximum in the stand. This will be a boost as Trinity have been limited by HS issues and presently a reduced 1500 capacity. 
 

HYBRID PITCH: ready for start of 2023 season. Irrigation system included.

NEW MODERN LED FLOODLIGHTS: Already up and paid for by Wakefield trinity. They are a vast improvement!

NEW ROOF ON SOUTHEAST CORNER: Already paid for by Wakefield trinity. 
 

NEW INTERNAL REFURB OF 2 FLOOR GYM, CLASS AND CAFE: Unsure on this???

 

NEW SCOREBOARD: Unsure of when this will be installed but believe it’s a good upgrade and I think to go southeast corner.

 

 

 

Isn't the north stand getting a new roof as well?

Link to comment
Share on other sites

17 minutes ago, PREPOSTEROUS said:

No, it's suppose to get a backing so it's not open towards the rear of the stand along with some food/drink outlets. Roof stays the same.

Yes that’s as I understand it. Think the roof is in good condition still as a structure as basic as it is. 
 

Adding a backing and some space at the back for refreshment stands are small improvements.

I believe that all the stand is going to be re surfaced to make it clean and even ground. Also there will be new markings and barriers installed on most parts of the stand. 
 

Certainly an improvement but 12-13 million will only stretch so far. 

Link to comment
Share on other sites

5 hours ago, Trojan Horse said:

Honestly the plans are impressive. The stand is to a high spec which will have excellent facilities on and off match day.

Trinity don’t forget have put in 1 million + of their own cash and bought the ground too for a few million.

New floodlights 

New hybrid pitch

New large scoreboard

New 2 floor gym in southeast corner (refurb and restructure). Also new roof on this building. Including a cafe facility and changing rooms/classrooms etc.

Newly resurfaced car park outside new east stand with fan zone area.

this is in addition to the new east stand and resurfaced/refurbished North stand.

I can’t wait  for it to be complete and it should pave the way for further developments! Money makes money. 
 

Trinity have gone from a few years ago having nothing but playing assets to owning their land, stadium and redeveloping it. That’s a huge achievement to the Carter era. 

 

Ooo a cafe facility i hope they do an All day English Breakfast, i’ll be the first there. 

Link to comment
Share on other sites

2 hours ago, Trojan Horse said:

I believe the below to be roughly right.

EAST STAND: July 2023 so towards end of next season. 
 

NORTH STAND: Believe the resurfacing, barriers works etc to be done before the start of 2023 season increasing the capacity to maximum in the stand. This will be a boost as Trinity have been limited by HS issues and presently a reduced 1500 capacity. 
 

HYBRID PITCH: ready for start of 2023 season. Irrigation system included.

NEW MODERN LED FLOODLIGHTS: Already up and paid for by Wakefield trinity. They are a vast improvement!

NEW ROOF ON SOUTHEAST CORNER: Already paid for by Wakefield trinity. 
 

NEW INTERNAL REFURB OF 2 FLOOR GYM, CLASS AND CAFE: Unsure on this???

 

NEW SCOREBOARD: Unsure of when this will be installed but believe it’s a good upgrade and I think to go southeast corner.

 

 

 

With not being up on the East, West, North, South parts of Belle Vue which stand is where the TV cameras go. Id be happy with just a bit of a corrugated tin roof to keep me dry and some decent terracing. 

Link to comment
Share on other sites

20 minutes ago, Josef K said:

With not being up on the East, West, North, South parts of Belle Vue which stand is where the TV cameras go. Id be happy with just a bit of a corrugated tin roof to keep me dry and some decent terracing. 

West, there's a bit of a roof at one end as it stands. There is no money to sort that side out as much as its desperately needed. Hopefully in time another funding source will reveal itself, whether from increased revenue from the east stand and use of the stadium outside of matchdays or a collabrleration with a football club (WAFC) if they ever want to return to the city and climb higher in the football pyramid. 

  • Like 1
Link to comment
Share on other sites

11 hours ago, Forever Trinity said:

Here is a link to those interested what a hybrid pitch is.

https://www.sispitches.com/hybrid-grass-guide

They are not cheap around 400K but last for around 8 to 10 years. the place will be totally changed by these improvements

I watched the pitch at the LSV being stitched , interesting stuff , creates a fantastic surface 

  • Like 1
Link to comment
Share on other sites

1 hour ago, PREPOSTEROUS said:

West, there's a bit of a roof at one end as it stands. There is no money to sort that side out as much as its desperately needed. Hopefully in time another funding source will reveal itself, whether from increased revenue from the east stand and use of the stadium outside of matchdays or a collabrleration with a football club (WAFC) if they ever want to return to the city and climb higher in the football pyramid. 

Thanks for that PREPOSTEROUS at least i know it now. Id imagine when it’s raining it gets a bit cramped under that little roof. 
Do you think WAFC will ever move in, at this moment in time they seem quite happy at Fev. I have always thought Wakey have had  a lovely pitch to play football on. 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.

×
×
  • Create New...